Whaley

Date Completed

2024

Build Duration

7 months

Architect

Builder

Nassar Development

Material(s)

Mild steel, banker wire, stainless steel

Finish(es)

All interior steel was gun metal blued, and exterior steel was rusted and lacquered

Process of Welding

Stick, MIG, TIG

Steel Fixtures

Structural steel from engineered basement floor to the roof / two story tall kitchen hood with book shelf on second floor / Custom steel braces outside to hold up the Flight timber-frame corbels / Metal mantels over all the fireplaces / Custom mono stringer staircase with traditional wrought iron pickets from Italy / Custom RCP ( reflective Ceiling plan) with custom bent steel / Custom Chimney caps to match the look of the home / All timbers were done by Flight Timber-frame / Pool house and front entry were done with Flight fabrication and Flight Timber-frame to flow seamlessly together.

No items found.