Slopeside

Date Completed

2025

Build Duration

Started the project in 2008 and completed in 2025. We completed 33 homes over that time all ski in ski out sites.

Architect

Builder

Nassar Development

Material(s)

Mild steel, stainless steel, architectural metals, wrought iron

Finish(es)

Custom Patina for interior staircases, and show pieces, powder-coating for exposed steel and exterior pieces, patina rust for a lot of the exterior braces, decks, and exposed steel.

Process of Welding

MIG, TIG, stick welding for structural, as well as flux core for structural members

Steel Fixtures

33 different custom staircases and railing with a various amount of different finishes and material types / Structual steel from the foundation to the roof / Custom steel braces to accommodate Flight Fabrication Timber frame, custom exterior exposed steel / 33 Custom decks with laser cut railings that look out over the ski runs / Bunk room rails and ladders to fit custom bunk beds / Custom made ski racks, benches, and ski storage to fit seamlessly in to the home