Isabelle Barn

Date Completed

2022

Build Duration

3 months

Architect

In-house CAD team

Builder

Material(s)

Mild steel, banker wire, stainless steel

Finish(es)

Custom patina for interior staircases, and show pieces, powder-coating for exposed steel and exterior pieces, patina rust for a lot of the exterior braces, decks, and exposed steel

Process of Welding

Stick welding for all structural steel, interior steel was done with MIG and TIG welding

Steel Fixtures

14’ custom bar with 100 year old timbers / Steel vanity with barn wood and granite / Custom coffee table with built in golf simulator shelf / Paris style light for over the card table